Flex Start Two is a manufacturing facility designed to be easily adjusted and adapted to each individual tenant in less than 1-2 months. The project is under development by the Klaipeda FEZ Management Company. After having rented out the first FlexStart building even before its completion in summer 2018, Klaipeda FEZ is now starting to develop a second FlexStart project.

Looking for speed? Welcome to FlexStart 2!

In today’s competitive business landscape, the speed of launch for the operation has become one of the main criteria when considering a location.

The FlexStart project was designed after detailed market analysis and dozens of conversations with current and prospective investors. The premises were designed with the likely requirements from light and/or assembly-based manufacturing and logistics companies in mind: up to 6.5 m clear height, all main communications, warehousing infrastructure, administrative premises, facilities for workers.

Additionally, Flex Start Two will feature showcase windows on the first floor, allowing retail operations or a showroom with a warehouse nearby.

Finally, FlexStart Two can be a solution for companies seeking temporary manufacturing premises: you can start at FlexStart 2 while your dedicated and larger factory is being built nearby.

Technical characteristics:

  • Total area: 8500 sq. m
  • Minimal unit for rent: 500 sq. m.
  • Clear height: up to 6,5 m.
  • Communications: electricity, heating, air conditioning, water supply, sewage, internet, access roads, parking, outside storage areas.
  • Access: gates or loading docks

What we can customize?

In administrative and workers’ zones:
area, floor plans, furnishing

In manufacturing and warehousing areas:
internal engineering systems: electric installation, ventilation, air extraction, water and sewage systems, compressed air systems, workspaces and technological rooms, floor loads.

Best for:

  • Light manufacturing
  • Assembly manufacturing
  • Retail
  • Warehousing
  • And other segments

Time from signing the contract to beginning operations:

  • Greenfield investment: 1-3 years
  • Acquisition of a company: 6-18 months
  • Renovating an old building: 6-12 months
  • Land plot with an approved construction permit: 6-9 months
  • FlexStart: 1-3 months